Trunnion pipes

We fabricated 16 of these doubler plates to be applied in trunnion pipes for our client, Boskalis. The total job included the engineering, shaping of the plate, milling of the holes and edge preparation for the welding procedures off-shore. The input of the engineering was provided by an offshore data survey. The images show the seamless connections to the tube on the offshore location.

© 2019 - Bijlsma Constructies Cookies